EQE provides project services to many well-known utility providers and their suppliers. The following compilation shows merely a few of the more significant projects.

Projects

Mechanical engineering project management for AUTONOVE

EQE is responsible for a significant part of the mechanical engineering project for AUTANOVE (self-contained emergency power supply for NPP Beznau, cost: 450 mil Swiss francs). The role that EQE plays in this important project includes the following:

  • Management of the mechanical engineering project team (5-8 people)
  • Technical, financial and scheduling responsibility for EQE project part
  • mechanical engineering
  • coordination of the general contractor
  • consultation regarding inquiries from the local authorities

Revision of the GSKL standard specifications in the role as subcontractor

As subcontractor, EQE revises GSKL specifications (pipes and fittings) ensuring that they are state of the art and consistent with today’s technical guidelines and building regulations. This revision requires that all specifications be examined to ensure that they conform to one another as well as agree with the requirements in the GSKL-specification pool. The details are then analysed with the authorities in charge (ENSI) or their technical experts (SVTI-N).

Thermal barriers for reactor main pumps

Project management of the quality assurance / quality surveillance for NPP Beznau including interface with the local authority, review of documents, construction supervision, and installation in the plant.

Restoration of mixed welds in the Pressurizer

Project management of the quality assurance / quality surveillance for NPP Gösgen including interface with the local authority, review of documents, construction supervision and installation in the plant.

Pump shafts reactor main pump

Project management of the quality assurance / quality surveillance for NPP Beznau including interface with the local authority, review of documents, construction supervision and installation in the plant.

Reconstruction of the absorption pipes of the reactor circulation loop

Quality assurance/ quality surveillance for NPP Mühleberg – writing specifications, review of documents and construction supervision of the installation in the plant.

Procurement of spare parts

Various procurements of spare parts for NPP Beznau and NPP Gösgen – writing of specifications for components, interface with the local authority, processing of quotations, verifying and writing review documents, conducting surveillance of component manufacturing and construction supervision during installations in the plant.

Fittings and valve manufacturing

Supporting supplier of the nuclear technology in the writing of specification and preview documents.